Hi,
I am aware that it is not possible to backtest over a discrete period in history (e.g. 2000-2001) with the performance analyzer.
I thus wish to amend my script so that if the date is before a certain date, one set of coding is used, but if it is after a certain date, another piece of code is used. In this way, I am hoping to apply different coding to different phases of the market's life, and use the backtest analyser over the whole period.
Is it possible to do this?
Thanks in advance.
Deax.
I am aware that it is not possible to backtest over a discrete period in history (e.g. 2000-2001) with the performance analyzer.
I thus wish to amend my script so that if the date is before a certain date, one set of coding is used, but if it is after a certain date, another piece of code is used. In this way, I am hoping to apply different coding to different phases of the market's life, and use the backtest analyser over the whole period.
Is it possible to do this?
Thanks in advance.
Deax.
Comment