    I've ran a few different backtests using the modified ATR formula and was wondering if there was any way to control the time period that is tested. I would like to test using specific periods.

  • #2
    Re: Backtesting Date Specific on the Modified ATR

    smerritt
    You would need to code the required logic in the formula
    Alex


    Originally posted by smerritt
    I've ran a few different backtests using the modified ATR formula and was wondering if there was any way to control the time period that is tested. I would like to test using specific periods.

    Comment


    • #3
      Alexis,

      Is this the case in general for backtesting on e-signal? Meaning that all time constraints are handled from within the .efs rather than the backtesting subroutine?

      Comment


      • #4
        smerritt
        If by "time constraints" you mean a specific backtesting period then you need to handle that in the script
        Alex


        Originally posted by smerritt
        Alexis,

        Is this the case in general for backtesting on e-signal? Meaning that all time constraints are handled from within the .efs rather than the backtesting subroutine?