Announcement

Collapse
No announcement yet.

A/D indicator

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • A/D indicator

    Can you program this formula ?

    1. We use Larry Williams Accumulation Distribution indicator (LWAccDis).

    2. Calculate the difference between the LWAccDis of current bar and prior bar.

    F1 = LWAccDis - LWAccDis[1]

    3. Compute a 14-bar exponential moving average (EMA) of this difference

    F2 = EMA (F1, 14)

    4. Smooth this average with a 7-bar exponential moving average (EMA).

    Indic A/D = EMA (F2,7)

    5. Plot "Indic A/D"
Working...
X