Announcement

Collapse
No announcement yet.

Drawing vertical lines for specific dates

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Drawing vertical lines for specific dates

    Hello Everyone

    I am new to eSignal, just curious if someone could tell me where I might find an .efs file to draw solid colored vertical lines according to a preset date then draw dotted lines x number of days before or after the solid colored lines.

    Michael

  • #2
    Michael
    See the script that Steve Meyer posted in this thread which will draw vertical lines on specified dates.
    Instructions on how to use and modify the efs are included in the comments in the script. To view them open the efs using the Editor (Tools-> EFS-> Editor from the main menu of eSignal)
    Alex


    Originally posted by JMLaney
    Hello Everyone

    I am new to eSignal, just curious if someone could tell me where I might find an .efs file to draw solid colored vertical lines according to a preset date then draw dotted lines x number of days before or after the solid colored lines.

    Michael

    Comment


    • #3
      Thanks Alexis,

      I figured someone had already written an efs for this or at least one that would give me a starting point.

      Michael

      Comment

      Working...
      X