I am having problems getting an ema of a calulated value. Normally the default for an ema is the close but instead I want to use a calulated var called 'dSum'. Logic tells me that using 'ema(21,dSum)' would give me this value, yet I am getting a very wierd plot line. Can someone please tell me what I am doing wrong.
Thanks, Steven
Thanks, Steven
Comment