What determines the order or graphical precedence of merged EFS studies? Is it the order in which the studies are added to the chart, or something else?
Specifically, I have a study which paints bands. One of my merge studies draws on top of the bands. The other one on the same chart is "behind" the bands.
Do you have any facility for determining or changing the order of execution precedence for EFS studies?? This is assuming that this would be the order in which objects were drawn or "blitted" to the charts, as well.
Thanks!
Specifically, I have a study which paints bands. One of my merge studies draws on top of the bands. The other one on the same chart is "behind" the bands.
Do you have any facility for determining or changing the order of execution precedence for EFS studies?? This is assuming that this would be the order in which objects were drawn or "blitted" to the charts, as well.
Thanks!
Comment