Jay,
These start/ end times can be adjusted, but..
the changes are not effecting :
the start/end time of....
1- the pivot point
2- the HOD/ LOD
I believe the studie's different additions are not linked
with the time change editing.
That is why I believe if i can change the time on esignal (to not stay linked to my computer time) that would eliminate all the problems.
example-
Woodies CCI settings stay set to EST,
then set Esignal to EST,
then my time on my pc can stay set to my t-zone
This would allow the EFS to run on its correct start/end times.
And let the time on the chart co-incide with the EFS
While leaving individual pc times un-changed.
make sense ?
GNO
These start/ end times can be adjusted, but..
the changes are not effecting :
the start/end time of....
1- the pivot point
2- the HOD/ LOD
I believe the studie's different additions are not linked
with the time change editing.
That is why I believe if i can change the time on esignal (to not stay linked to my computer time) that would eliminate all the problems.
example-
Woodies CCI settings stay set to EST,
then set Esignal to EST,
then my time on my pc can stay set to my t-zone
This would allow the EFS to run on its correct start/end times.
And let the time on the chart co-incide with the EFS
While leaving individual pc times un-changed.
make sense ?