Hi
I'm triyng to place in an non price study like O.I. a Linear Regression
I found it impossible with FW .
Anyone has suggestions on how to loop in F. wizard or if there is an efs (maybe a volume one?) suitable to be adapted changing few lines in the Editor?
And how about if I wished it squared and not linear?
The mission is to normalize the OI against the abnormus increasing close to the expiration and to get the average number of O.I. per day.
Thanks in advance for the help.
Cordailly
Fabrizio
I'm triyng to place in an non price study like O.I. a Linear Regression
I found it impossible with FW .
Anyone has suggestions on how to loop in F. wizard or if there is an efs (maybe a volume one?) suitable to be adapted changing few lines in the Editor?
And how about if I wished it squared and not linear?
The mission is to normalize the OI against the abnormus increasing close to the expiration and to get the average number of O.I. per day.
Thanks in advance for the help.
Cordailly
Fabrizio
Comment