I use MB Trading. When I move an order, esignal crashes. I sent several crach report off to you in the hopes of a quick fix. I checked using navagator and the order does in fact get changed.
I get "into" esignal direct to use the integrated trading not via navagator (seems esignal trys to log into MBT 2 times so none of the integrated stuff works.)
HELP!
Thanks,
John
I get "into" esignal direct to use the integrated trading not via navagator (seems esignal trys to log into MBT 2 times so none of the integrated stuff works.)
HELP!
Thanks,
John
Comment